The bathroom needed just about everything to make it livable. |
New tub surround and fixtures were a must. |
The flooring and cabinetry were both in good condition. |
A new toilet was first on the list! |
Additional wiring had to be installed for the new light fixtures. |
The job took longer than expected so we could only make a day trip to see the progress. |
What a difference! |
Rather than replacing the drywall, we chose to install cedar planks to cover the settling cracks. |
We purchased the faux wood blinds from Home Depot.http://www.homedepot.com/p/Home-Decorators-Collection-Cut-to-Width-Maple-2-1-2-in-Premium-Faux-Wood-Blind-39-5-in-W-x-64-in-L-10793478073511/202956199?N=5yc1vZbc8b |
We replaced the hardware with what was originally there. http://www.lowes.com/pd_231710-77652-S161-82-DBK_0__?productId=1064767&Ntt=black+cabinet+hardware&pl=1¤tURL=%3FNtt%3Dblack%2Bcabinet%2Bhardware&facetInfo= |
No comments:
Post a Comment