| The bathroom needed just about everything to make it livable. |
| New tub surround and fixtures were a must. |
| The flooring and cabinetry were both in good condition. |
| A new toilet was first on the list! |
| Additional wiring had to be installed for the new light fixtures. |
| The job took longer than expected so we could only make a day trip to see the progress. |
| What a difference! |
| Rather than replacing the drywall, we chose to install cedar planks to cover the settling cracks. |